Welding
The welding process (operations)
as piece assembly, case welding, flanges to the case and welding
machine for SAW does so on. Column and the Boom pillar is 7
meters height and 6 meters length.
MIG, TIG manual welding machines
and positioner machines and metallic and elastic movers are
under control unit supervision.
Assemblies
All assembly operations including
tubes assembly to tube sheet, expand and Welding the tube to
tube sheet by orbital welding machine and assembly the bundle
tube to the case by Boom welding And pillar fixture and special
tables are performed in this unit.
Stress Releasing Furnaces
This furnace is 5.3.6-meter
dimension is used for some pieces that need stress releasing.
Final Tests
After final assembly the
production are transferred to this part for hydrostatic test. In
this part, there is the possibility of pressure test to 250 bars
by hydraulic pump and other equipment.
The production fabrications in
the shop after control are taken out of shop for final processes
including sandblast; painting and packing after all else will be
delivered to the costume.
At the end Persian Gulf Pert Gas
Company, considering above explanation declare its preparation
to make various kinds of Air Cooler , Shell&Tubes Pressure
Vessel , Storage Tank , Steel Structures in gas and oil field.
Back
|